Brownsville Public Utilities Board Implements Asset Management Best Practices
Brownsville Public Utilities Board Implements Asset Management Best Practices The Brownsville Public Utilities Board (BPUB) was formally chartered by the city of Brownsville in 1960
Hot Strip Mill Regaining Former Status
Hot Strip Mill Regaining Former Status Background In 2017 a major steel company decided to focus on a significant reliability improvement initiative at several of
A Modernizing Steel Mill Mitigates Production Impact of Planned Shutdowns with an Operational Risk Assessment and Risk Register
A Modernizing Steel Mill Mitigates Production Impact of Planned Shutdowns with an Operational Risk Assessment and Risk Register A steel production facility dating back to
A Global Pharmaceutical Manufacturer Applies Risk-Based Asset Management to Improve a Filling Line’s Reliability
A Global Pharmaceutical Manufacturer Applies Risk-Based Asset Management A diversified, global healthcare leader produces vaccines and other injectables in one of its U.S. locations. A
How a Cheese Manufacturer is Meeting Growing Customer Demand
A cheese manufacturer engaged with Life Cycle Engineering to apply a time-tested Reliability Excellence® (Rx) approach to meet its objectives: evaluate the current state of
Solving Motor Issues Reduces Production Downtime for a Major Steel Company
Solving Motor Issues Reduces Production Downtime for a Major Steel Company An integrated steel producer with major production operations in the United States and Central
Drilling into the Data Helps a Steel Company Reduce Downtime and Improve OEE
Drilling into the Data Helps a Steel Company Reduce Downtime and Improve OEE A steel producer was incurring significant unscheduled downtime due to equipment and
Calculating Total Cost of Ownership Requires Knowing the Cost of Materials
Calculating Total Cost of Ownership Requires Knowing the Cost of Materials A food manufacturer with several existing production lines spread across the U.S. wanted to
Even Small Wins Matter – Improving a Pulp-and-Paper Mill’s Sheet-Break Recovery Time
Even Small Wins Matter – Improving a Pulp-and-Paper Mill’s Sheet-Break Recovery Time (1) As part of implementing Reliability Excellence in a large pulp-and-paper mill, Life
An Aluminum Cast House Throughput Study Identifies Strategies to Improve Output by 13%
Aluminum Cast House Throughput Study Situation An aluminum producer needed to increase production capacity. It turned to Life Cycle Engineering (LCE) to help with a